Stakeholders

Electric cooperatives face the same grid transformation challenges as large utilities — with smaller planning teams.

Rural EV adoption is following infrastructure — charging at home overnight on circuits that weren't designed for that load. Agricultural electrification is adding significant new demand in areas where distribution infrastructure was sized for a different era. LoadSEER gives cooperative planning teams the same spatial forecasting capability that major IOUs rely on — and LoadSEER Studio deploys in days, not months.

Get in touch
🌾
IMAGE PLACEHOLDER — CO-OP SERVICE TERRITORY
Visual: Rural H3 hex load growth map — sparse territory with high-growth clusters near small towns or industrial loads.
Planning challenges

The questions IA analytics helps you answer

Rural EV and electrification load

EV adoption in cooperative territories concentrates overnight charging load on rural feeders with limited capacity. Knowing which circuits will be stressed — and when — is essential for capital planning.

Agricultural electrification

Grain drying, irrigation pumping, and processing facility electrification add large, concentrated new loads on distribution systems designed for a different load profile.

Small planning team capacity

Cooperative planning teams are typically small. Tools that require extensive manual data work or months of integration before producing useful forecasts don't fit the operational reality.

Distributed solar and storage

Member-owned solar and battery storage creates bidirectional power flow on circuits not designed to handle it — requiring visibility into DER adoption at the circuit level.

Ready to learn more?

Talk to IA about spatial forecasting for your cooperative

Get in touch